The first is “floor loading”, which means the bags are loaded directly on the trailer floor and will need to be manually unloaded. A party of 4 will require roughly 3 hours to unload a trailer.
The second option is palletized, which means that the bags are stacked on pallets and double stretch-wrapped with plastic. With a forklift and a pallet jack, you will spend approximately 1 hour unloading and you will save handling on each bag.
You will have between 1170 and 1224 bags of wood shavings in your load, depending on trailer size, bag size, and whether the floor loaded or palletized.
Phone numbers
|
LocationsLitière Royal inc. (Head office) Ripco inc. Sunrise Shavings llc RWS manufacturing inc. |